A Bronx shed job we installed, and what has changed in the rules since.

Hull Avenue, Norwood – sidewalk shed, 2015

We installed the sidewalk shed at 3346 Hull Avenue (10467) in 2015. See the project page.

The rules have changed since then. Sheds now renew every 90 days, and each renewal carries a repair-progress report. DOB’s August 2026 rules also add graduated penalties for sheds that stay up too long, which DOB expects to start imposing in early 2027. Our construction permit page covers each change.

What we put up in the Bronx

Six services, with the DOB filing handled by the same firm that installs the work.

Sidewalk sheds

Overhead protection above the sidewalk. We file the permit and install the shed.

Pipe scaffolding

pported access for facade work on buildings that frame systems don't fit.

Temporary fencing

Site perimeters at ground level.

Jersey barriers

Vehicle and pedestrian separation.

Sidewalk shed inspections

ed written reports at installation, every six months and after repairs.

Permits and violation removal

The filing and paperwork side of the job.

Bronx buildings and the rules they share

Norwood’s Hull Avenue shows the borough’s typical stock: five- and six-story brick apartment buildings from the 1920s through the 1940s, many with elevators. For sidewalk shed projects, three DOB requirements are worth planning around:

We handle the filing through DOB NOW: Build, so you don’t have to make a separate trip to the Bronx Borough Office. 

From Brooklyn to the Bronx at any hour

Our office sits at 8808 Foster Ave in Brooklyn. We answer the phone around the clock, nights and weekends included, and arrival averages two hours across the city. That is a citywide figure, so we promise no set time for a single address.

How a Bronx job runs

Four steps take you from an address to an installed, permitted shed.

  1. You send the address and the type of work.
  2. We check the building’s DOB record for open violations and earlier filings.
  3. We file the permit in DOB NOW and tell you what DOB needs from you.
  4. Our crew installs the equipment and posts the permit at the site.

FAQs

All of them, including Norwood, Fordham, Kingsbridge, Riverdale, Mott Haven, Morrisania and Pelham Bay.

Yes. Sidewalk shed installation requires the applicable DOB permit before the shed is erected.

Ninety days. You renew it with a repair-progress report. Source: NYC Mayor's Office, August 20, 2026.

The general contractor does. Without one, the contractor doing the work does. When no work is active, the building owner does. Source: DOB Scaffold & Shed Permit.

Yes. We prepare and file the paperwork as part of the job, so you need no separate filing service.

Yes. We installed the sidewalk shed at 3346 Hull Avenue in Norwood in 2015.